As the fabricator of several major projects such as LGPC M2 OCU project, DAEBONG had fabricated DEPROPANIZER. For the end user of IDIAN OIL CORP. Ltd. Toyo Engineering Corp had worked with Daebong for Naphtha Cracker Project India. The project requires of tubes & Pipes material A179 & A210-A1 tubes in 2007.
Seamless & Welded Stainless Steel Pipes
Product Rage
PROJECT INFORMATION
Project Title : Napha Cracker Unit
Client / Owner : Indian Oil Corporation Ltd
E.P.C : Toyo Engineering.
Location : Panipat
In 2018, Toyou Engineering Corp signed a contract with Maruzen Petrochemical Co., Ltd to increase ethylene production at its Chiba Plant. Seen from this case, the expansion of facilities & maintenance requires of related material & steel products in relations to original design and application of materials that used to built on the first stage of the plant.